Beadboard is available from any home improvement store along with all other materials necessary to cover the tile.
Ceramic ceiling tile over wall board.
Complete the job by piecing in any missing drywall and taping the seams.
Screw the drywall to the studs.
For countertops use 3 4 inch plywood beneath the backer board.
Ceramic tile advice forums.
It s as easy to work with as ordinary drywall but it s specially formulated to resist moisture.
Step 1 prepare the wall ceramic tiles can be installed directly on drywall plaster or if they are in moist areas onto green drywall or even better cement backer board.
If it is plywood not osb not pressboard and not luan you.
May be able to tile over it but the safer method would be to put a 1 4 cement board over it.
And it lasts for 20 years.
Tile is laid onto the cement board with thinset mortar or mastic.
Cut drywall to fill in between the existing wall or ceiling and the cement board.
Placing beadboard over the tile requires first preparing the tile surface and applying the boards over the top.
As far as cleaning the vinyl try.
Half inch cement backer board is ideal for most tiling jobs including walls floors countertops and ceilings.
Both green board and cement board are excellent substrate for wall finishes such as tile or frp fiberglass reinforced panels albert penna of dna architects says that properly installed tile or frp helps protect walls from the elements grease water pests throughout the operation of a commercial kitchen.
Screws secure the cement board to the wall studs.
Step 1 clean tile to ensure that all dirt and foreign surfaces are removed from the surface.
Definitive answer to this question for shower wall surrounding walls and ceiling is redguard over cement based backer board significantly better than redguard over regular greenboard.
Place strips of blue painter s tape over the tile face sticking each end to the wall to prevent the tiles from sliding.
Green drywall is specifically designed for use in bathrooms.
How to install tile backer board.
Cover all of the corners joints and seams including the joint where drywall and cement board meet with the fiberglass mesh tape.
Continue placing the first course of tiles in the same manner using spacers.
Tile on tile or as i say it.
For flooring the backer board should be installed over a 5 8 inch thick osb or plywood base.